Skip to content

Sign-offs and submission

Learn it in the academy: Sign-offs and submission (video)

The Sign-offs tab of a joint proposal is where the text is fixed, agreed and submitted. A proposal with only one organisation calls the tab Submission and skips the signatures.

One line at the top always says what comes next for you — compile, recompile, sign, who it is waiting on (by name), move on, submit, record the outcome. The tab never leaves you without a next step.

  1. Compile. The lead compiles the accepted answers — accepted on the Application form tab — into the text partners sign. Preview changes shows the result without saving it.
  2. Sign. Each partner organisation signs that exact text. Where an organisation named a signatory, only that person can sign for it.
  3. Submit on the funder’s portal, then Record submission here.
  4. Record the outcome when the funder decides.

Only accepted answers compile. An answer still in draft or in review shows as a gap — nothing blocks compiling, so the lead can compile early to see what is missing.

With the funder’s form, what is compiled and signed is the form’s answers. Without one, it is the proposal document.

The page count is an estimate: the text laid out on A4 in the platform’s fonts, plus the pages of uploaded PDFs. The funder’s own layout will differ, so it warns near and over the limit rather than refusing.

Recompiling a changed text voids every signature. Partners sign one exact version; a different version needs signing again.

Signing records agreement with that text. It freezes nothing, sends nothing and submits nothing.

Before the lead organisation has accepted (on a proposal a grant writer started), only the preview runs: compiling, signing, submitting and the outcome wait for the lead.

At the Concept stage the tab offers Move on to the full proposal. The concept is frozen with its sign-offs as the record, and the full proposal opens. It does not wait for every signature.

The submission itself happens on the funder’s own portal. Recording it here notes the date, the text it was made from, and optionally the funder’s confirmation file.

  • A joint proposal records it from the full-proposal stage; one organisation alone can record it at any stage.
  • Recording a text that not everyone signed, or one older than the latest answers, warns but never blocks.
  • A submission can be reopened; the earlier one stays listed under Earlier submissions.

Awaiting decision, Funded, Not funded or Withdrawn.

Not funded and Withdrawn ask before saving, because they start a clock: 90 days later the personal-data paperwork of the whole bid is deleted — CVs, IDs and other deliveries marked as personal data. A funded bid keeps them.

Something wrong on this page? Report it